Engineering solutions for your comfort



HOUSE ENGINEERING is a design company that performs  projects of heating,  ventilation and  conditional systems

Our services are qualified and versatile.
Design of engineering systems
Design of engineering systems
Author's supervision
Supervision allows you to control the execution of the realization of design decisions on the subject.

OUR TEAM

Anastasiya
Department of ventilation and air conditioning systems
Sergei
Division of heating systems, water supply and sanitation
204
DEVELOPED
PROJECTS
148
REALIZED
PROJECTS
30841
GENERAL
AREA

02-12-2019

27-11-2019

Organization of extracts from bathrooms

To organize the exhaust from the bathroom, it is necessary to provide an exhaust fan.

Yacht Club

The system of ventilation and heating system in the building combined. The building almost everything is made of glass. ventilation equipment is placed on the street - it affected the division of the installation of heating circuits in a water-inner loop and the outer - frost water solution of propylene glycol. Also on the premises of the Yacht Club is designed system of central vacuum, which allows you to clean the room silently.

A restaurant

In the design of ventilation and air conditioning of the restaurant had a task to enter the ventilation ducts into the interior of the ducts open and pave the ceiling. To do this, we used the circular duct in the color of the interior walls.

Hotel

In the project all the questions on heating and air conditioning covers the same equipment- heat pump air-water.


For hotel rooms installed fan coil channel type. A fan coil air circulates.


Inside the fan coil air is heated by the heat pump in the winter and cooled in summer.

Camping

Projects heating and water supply have been resolved the relevant issues for 20 houses "camping" type of international Wellness-center "Bioli Hall" in Georgia.


The peculiarity of the work was that, using the combined water and electric underfloor heating, heat the house at different times of the year, taking into account the workload of holidaymakers.

Cinema

Draft ventilation and air conditioning systems and air heating Multiplex cinemas zone.


Territory cinema is divided into 3 separate zones: the cinema area foe area and cinema projection area.

Good Wine

For «GoodWine» store space design of ventilation systems was carried out, the heating and air-conditioning.


The challenge was to use the existing 6 air handling units that are on the roof of the building for the needs of ventilation, heating, and air conditioning shop. Because the height of commercial premises of the 1st floor is a large - were used rotary diffusers with the possibility of changing the angle of inclination of the blades.

The Academic Theater of Drama and Comedy on the Left Bank of the Dnieper

The project of ventilation, air conditioning and air heating of the theater was completed.

Roof conditioner (Rooftop) closes the issue of ventilation, air conditioning and air heating.

The project envisages the use of existing building ventilation systems as auxiliary ones.

Ventilation paint shop

To ensure the ventilation of the paint shop, the supply and exhaust ventilation systems were designed separate.

For this purpose, structural features of the building and premises were taken into account, inside the room is a crane-beam.

Adaptation of the air conditioning system for new layouts

To adapt the air conditioning system, several important points must be considered.

Sports complex with a swimming pool in the city of Khujand Tajikistan

In Tajikistan, a draft ventilation and dehumidification system for a sports complex with a swimming pool was completed.

The peculiarity of this project was that in the central room there is a huge swimming pool with 450 spectators.

Covered market

The ventilation system of the covered market is combined with the cooling system. The air heating and cooling system is designed on the basis of equipment that operates on the principle of a heat pump.

That allows you to save energy.

Heat point with hot water heating from the air-conditioning system

The project is designed to heat water for a hot water system using a heat pump, based on equipment from LG.

Through the intermediate heat exchanger freon-water, which is called HYDRO KIT, water is heated to a temperature of +50 С.

Show all
Your name
Your e-mail
Enter your question or message

Ask your question

«HOUSE ENGINEERING» - design-assembly company, which performs the full range of activities from design to delivery of equipment and commissioning.